Book a call

London

All posts

How we make event tech work on the day

Five habits behind activations that hold up in front of a queue, with examples from Marathon Athens and the Boring Phone.

Published

An activation gets one go. The doors open, a queue forms, and whatever we built either works in front of it or doesn't.

Across 48 bars and pubs, the Boring Phone ran more than 19,200 prize draws with zero hardware or software incidents. That came from a handful of habits we bring to every build. Here are five, with the projects that show them.

1. Build before the creative lands

Final creative is often late, so we build all the core functions against a plain test interface first and put the branded UI on last.

At Marathon Athens, final approval arrived two days before go-live. Because everything underneath was already built and tested, the activation went live within 24 hours, with nothing cut from the scope.

2. Don't let the public steer the AI

Free text is the easiest way for an AI activation to go off-brand, so we leave it out. At Marathon Athens the flow was drag-and-drop with no free-text input anywhere. Each person also chose from several artworks, so a weak image never reached a printed gift.

Two visitors choosing an art style by drag and drop on a touchscreen at Marathon Athens

3. Put the controls with the people on the floor

The people standing next to the queue should be able to respond without phoning a developer.

At Marathon Athens, an admin panel let the on-site team switch AI models live and adjust prize odds and stock. When the queue built at peak, they switched to a faster model on their own and the line kept moving.

On the Boring Phone tour, the control was a physical dial. Bar staff tuned the sensor for each room by turning a knob, with no laptop and no config files.

4. Plan for the venue, not the workshop

Venues aren't test benches. Networks are patchy, and every room has different light and crowds.

For Athens, downloads and entry records were built for patchy venue networks, so the print team never waited on the connection. For the Boring Phone, motion events were checked and debounced before a draw, so a crowd brushing past didn't count as a cheers, and the dial handled each bar's light and layout.

5. Test before the day, stay reachable on it

Everything is tested before the day. On the day, we're on site or on call.

The Boring Phone had remote access and over-the-air updates ready from the UK for the whole tour. Nobody needed them, but they were there.

Why it matters to an agency

The activation carries your name and your client's brand. None of these habits is exciting. They're how we make sure it holds up in front of the queue.

You can read the full stories in Behind the build: the Boring Phone and Behind the build: Marathon Athens.

If you've got a 2027 brief with a fixed date, send it over and we'll tell you how we'd build it.

Contact

Got a briefthat scarespeople?

Say hello

Elsewhere

Based in

United Kingdom

Working across the UK & Europe

© 2026 Brunyee Software Studio